You have now walked up from the lobby corridor
and turned right. Here we have the new Showers and Changing rooms on
the left hand side. These changing and shower rooms are still
under construction, (October 1999) however we hope to have them
finished very soon. The right will have a leaders locker room.
Click Bottom Left to view a shower. Click at bit higher to view a
Changing room.
Click in the middle to the far back and you will walk into
the Work shop area.
Click on the bottom of the picture to
the corridor to the Lobby and Dry Stores,